Loading...
Skip to Content

Our Products

uEngine PAL

uEngine PAL - an enterprise process asset library that turns process manuals into living data.

uEngine PAL brings the enterprise processes that lie dormant in PPT and PDF files into one place and turns them into a living Process Asset Library. It governs the process hierarchy from Mega down to Sub level, RACI, approval and audit evidence, and mandatory Rules as structured, executable models and data, solving version confusion and dependence on tacit knowledge at the root. From standardization to collecting improvement ideas from the front line (PI Flag) and preparing for ISO/CMMI certification, it covers the whole journey and serves as the single source of truth for sustainable process innovation.

Why uEngine PAL

Four problems every organization pursuing quality management, ISO/CMMI certification or digital transformation runs into.
PAL manages the process hierarchy, work procedures, and approval and audit evidence as assets the whole organization shares.

Documents are scattered and no one can find the latest version

Rulebooks, SOPs and work manuals are scattered across Word and PDF files, so there is no version control and the information you need is hard to find when you need it.

Know-how is tied to people

Work procedures depend on individual experience and tacit knowledge, so continuity breaks whenever the person in charge changes.

Certification and audits demand constant proof

You need a system that continuously checks compliance with international standards such as ISO and CMMI and responds flexibly to audits.

Standards must come before automation

Before introducing RPA, BPM or AI, you need to visualize the As-Is and establish To-Be standard processes.

What sets uEngine PAL apart

The map is the navigation

The Mega → Major → Sub process hierarchy is the system's home screen. Every card carries its approval stage and version, and company-wide progress shows up in a single summary bar.

An executable model, not a drawing

From approve/reject branches to corrective-action loops, every branch of the flowchart is expressed as a BPMN 2.0 model with execution conditions.

Property data, not tables

RACI, detailed procedures, deliverables and mandatory Rules are stored as structured task properties you can query, analyze and audit.

From the second process on, you assemble

Register standard tasks such as executive approval or e-approval submission in the Task Catalog once, and reuse them in any process with every property, down to the procedure and RACI.

New templates without redeployment

The Property Schema Studio absorbs each customer's own process-description template through admin settings alone. No code changes, no redeployment.

Aligned with ISO document control

A stage 0–4 approval workflow, regression checks before merge and an append-only audit log: the control structure internal audits require is the default.

Process control and extensibility

Stage 0–4 approval workflow

Draft → review → open consultation → final edit → publish. Changes between versions are compared as field-level diffs, and dual approval by headquarters and the business unit, down to reopen requests, is tracked on one screen.

Checks before merge

Before a merge, PAL automatically checks whether a change breaks existing behavior. "This merge breaks N steps of existing behavior" — you are told right above the merge button.

Append-only audit log

Four tabs: approval history, admin audit, logins and downloads. Values before and after a change and the reason are recorded, and edits and deletions are blocked at the database level. Export to CSV and submit immediately.

Policy document impact tracking

When you register a rule or policy document, PAL automatically tracks which processes use it. It answers "what is affected if we change this rule?" instantly, and documents in use cannot be deleted.

Edit locks and maintenance mode

During closing or reorganization periods, editing is frozen per target. An edit lock is held by one person at a time, and large structural reorganizations are applied in one batch through a controlled cut-over in maintenance mode.

Org chart and membership approval

Edit the department tree by drag and drop; new members can access organizational data only after an administrator approves them. Pre-registering new hires and assigning department heads and permissions all happen on one screen.

FEATURES

From process design to operations and analytics to PI Flag improvement initiatives. Click each item to see it with real screens.

Process design · building assets
▶The process map in your documents becomes the system's home screen
The process map from your process manual — the Mega, Major and Sub hierarchy arrives as a tree and can be explored in four views: hierarchy, cards, matrix and diagram. Every card shows its approval stage (0–4) and version, and the summary bar at the top shows at a glance how far the company's processes have progressed.
Process hierarchy screen — the domain, Mega, Major and Sub tree with a per-stage summary bar
Process hierarchy screen — the domain, Mega, Major and Sub tree with a per-stage summary bar
▶Draw it in a few clicks, and it is an executable model the moment you do
The lanes are the participating organizations from the process manual — the requesting department, Purchasing, Finance. Use the context menu to chain tasks and gateways to create branches. What matters is that this is not a drawing. The approval gateway holds its branch conditions as real values, and even the rework loop that returns to the request step on rejection is captured in a model with execution conditions.
BPMN flowchart designer — requesting department, Purchasing and Finance lanes with an approval branch
BPMN flowchart designer — requesting department, Purchasing and Finance lanes with an approval branch
▶Build a standard task only once
Executive approval, e-approval submission, filing a corrective action plan — register recurring standard tasks in the catalog and reuse them in any process with all their properties. The moment you apply one, it brings in not just its name and task type but its detailed procedure and RACI assignments, and you can register a well-built task back into the catalog right where it is. From the second process on, you are not drawing but assembling.
Task Catalog management screen — list of standard task cards
Task Catalog management screen — list of standard task cards
Task Catalog section in the properties panel — applying a standard task
Task Catalog section in the properties panel — applying a standard task
▶Every table in your process descriptions becomes living data
For each task, the detailed procedure is managed as a step-by-step list, and RACI as five roles: Responsible, Accountable, Support, Consulted and Informed. For quote review it might be R Purchasing, A Finance — leave Responsible blank and the name of the lane the task sits in is filled in automatically, and in the integrated matrix you edit the whole task × organization table with cell clicks alone. Reference and output documents and mandatory Rules are stored as task properties too.
Integrated RACI matrix — editing the task × organization table with cell clicks
Integrated RACI matrix — editing the task × organization table with cell clicks
▶Each customer's own templates, absorbed without redeployment
Some companies use Input/Output tables; others use control Rules. When an administrator defines a field's key, label, type and option source in the admin screen, it appears instantly in the flowchart's properties panel. When a new document template appears, you just add items in list management, with no deployment. "The property metamodel itself is driven from the admin screen — that is PAL's big differentiator."
Property schema management screen — admin-defined field list with a properties panel preview
Property schema management screen — admin-defined field list with a properties panel preview
▶The machine catches it; a person confirms it
One Validate button runs two stages. Stage 1 is machine validation — it immediately finds broken connections and missing required properties. Stage 2 is the mandatory Rule checklist — click an item and the canvas moves to that task, showing the full Rule text, owner, reference and output documents, and procedure side by side on one screen, so a person can check the evidence. Control is complete even without AI.
BPMN validation results — structural validation warnings and the mandatory Rule checklist
BPMN validation results — structural validation warnings and the mandatory Rule checklist
Operations · analytics
▶Enter the data, and out comes the process manual
The PDF definition export assembles the cover, the full diagram, process settings, every property of each lane's tasks (RACI, procedure, inputs/outputs, system integrations, custom fields) and the integrated RACI matrix into one document. The effort of writing process manuals disappears. BPMN 2.0 XML and PNG export also give you compatibility with other tools and backups.
PDF definition preview — cover and diagram
PDF definition preview — cover and diagram
▶Report adoption results with data
The analytics dashboard aggregates progress, process analysis, operations and input accuracy. From the number of processes per stage to KPI attainment by organization and stage regressions (churn) — it answers "we introduced the system, but is anyone actually using it?" with usage activity data. Administrators can rearrange the tabs themselves and connect Grafana boards.
Analytics dashboard — Progress tab
Analytics dashboard — Progress tab
▶Company-wide terms gather in one glossary
The "Definitions" table from your process manuals moves into the system. When you define a term in a process, existing terms are suggested for reuse, and terms from across the organization gather on the glossary page, revealing "which process uses which term in which sense." Inconsistencies in terms that each department used differently become visible.
Glossary page — definitions per term and the processes they come from
Glossary page — definitions per term and the processes they come from
▶Diagnose the organization with a process knowledge graph
Extract a process knowledge graph from your registered BPMN assets and explore it in 2D and 3D. Fifteen analysis engines, covering bottlenecks, single points of failure (SPOF), automation potential and more, answer "what stops if one person is missing?" as a graph, and the What-if simulator lets you review a redesign. It is built on Apache AGE, the graph extension for Postgres.
Org chart screen — department tree and member placement
Org chart screen — department tree and member placement
PI Flag · continuous process improvementImprovement points left as flags on the process model become structured data rather than scattered notes, and gather into company-wide improvement initiatives. The cycle of continuous improvement (CAPA, PI) runs inside the system.
▶Every employee's improvement ideas become assetsConnect improvement ideas from the front line to the evidence for To-Be design2 screens

Mark it directly with a flag — Leave an improvement point as a flag on a single task or across several segments, and classify it as an immediate fix or a future initiative.

Accumulate as structured data — Enter the problem, improvement direction, reason and type in structured form, down to quantitative figures.

Converge into company-wide initiatives — Derive improvement initiatives across all processes on the roll-up board, and connect them to To-Be design and CSV or issue JSON exports.

"Improvement ideas from the front line come back as the evidence for To-Be design."

PI Flag roll-up board — company-wide improvement initiatives with timing, type and reason per process, CSV and JSON export
PI Flag roll-up board — company-wide improvement initiatives with timing, type and reason per process, CSV and JSON export
PI Flag in the properties panel — improvement initiatives registered on a task, with status, type and reason
PI Flag in the properties panel — improvement initiatives registered on a task, with status, type and reason
Compared with document-based management
▶How it differs from document-based management
ItemDocument-based process managementuEngine PAL
Process mapPPT slides — aging out of step with the systemsThe system's home screen — approval stage and version on every card
Workflow diagramsDrawings — branch conditions exist only as descriptive textBPMN 2.0 models with execution conditions — down to loops and branches
RACI · proceduresTables inside documents — impossible to search or analyzeStructured property data — cell-level editing in the integrated matrix
Standard tasksCopied and pasted into every processTask Catalog — reused with every property, down to procedure and RACI
Template changesAn SI development job — a quote and a deployment scheduleProperty Schema Studio — admin settings, zero deployments
Revision processBack-and-forth email and approval attachmentsStage 0–4 approval workflow + field-level diffs + checks before merge
Audit evidenceWeeks of manual collection before every auditSubmitted instantly as CSV from the append-only audit log
Producing process manualsSystem and documents written separatelyPDF definitions generated automatically — enter the data and out comes the manual

Benefits

Process standardization and visualization

Complex work procedures are visualized as a hierarchy in international standard notation, so anyone can understand them intuitively.

A single source of truth

Procedures, forms and related rules are consolidated into one central library, preventing version errors.

Faster onboarding

Registered standard process manuals shorten handovers and maintain quality even when people change roles.

Continuous process improvement

Regular monitoring identifies bottlenecks and improvement points, keeping organizational maturity continuously up to date.

PI Flag structures improvement ideas from the front line and creates a continuous improvement cycle that leads into company-wide initiatives and To-Be design.

Explore PI Flag improvement initiatives

Utilized technologies

• BPMN 2.0 · DMN: Full compliance with international standards. Export to standard XML for compatibility with other tools and no vendor lock-in.
• Multi-tenant isolation: PostgreSQL row-level security (RLS) isolates tenant data at the database level.
• Apache AGE knowledge graph: Stores and queries the process ontology on the Postgres graph extension.
• Authentication and security policies: Configure MFA, session timeouts, login lockout and download anomaly detection per tenant.
• Append-only audit: Database triggers block edits and deletions to the audit log, so the integrity of the evidence is guaranteed by design.
• Flexible deployment: From a one-command Docker Compose start to Kubernetes manifests — on-premises installation is supported.

Bring us one process manual. It comes back as an asset.

We'll prepare a PAL demo using your own process descriptions. From registration to validation to audit evidence — exactly as you saw today.